// EV Infrastructure
Charge Faster.
Charge Safer.
The fastest-growing EV markets in the country are Texas, California, and Florida — and the wiring most homes have wasn't built for them. We fix that.
Book Installation →Certified Installer For
Tesla
ChargePoint
Wallbox
JuiceBox
Rivian
Emporia
Grizzl-E
Autel
Install Process
01
Site Assessment
Free virtual or in-person evaluation of your panel capacity, run length, and ideal mount location.
02
Permit & Load Calc
We pull permits, perform NEC load calculations, and coordinate utility service upgrades if needed.
03
Installation
Hardwired install on a dedicated 240V circuit. Wire-management, conduit, and clean finish.
04
Inspection & Activation
Pass municipal inspection, commission the unit, and walk through the app and charging modes.
$1,200
Typical Home Install
7×
Faster Than Level 1
2 hr
Average Install Time